Objectives
The Management System developed objective is to mobilize flexibility mechanisms that are energy storage systems and load management, to ensure the electrical system stability at an optimal operating cost, despite a high penetration rate of intermittent renewable energies.
Supported by a team of 4 engineers, GYSOMATE entered into operational phase on October 2017.
The GYSOMATE project is divided into 4 actions:
- Action 1: Microgrid simulator
- Action 2: Connected and controllable production and storage units
- Action 3: Aggregation platform
- Action 4: Energy Management System